MENU

Pulley Type

Bored Pile Grab

Pulley Type

OFFER REQUEST

Bored Pile Grab

  • Discharging of the grab jaws is rapid and easy, besides maximum capacity of grabbing.
  • The hammer grab is the most important tool in pile construction and it determines the drilling progress.
  • The entire construction is stress relieved and extremely strong.
  • Surfaces exposed to abrasion are manufactured by Hadox 500 material.
  • Chassis and arms that required endurance are manufactured by Weldox 700 material.
  • Guide and holders are manufactured by S 355 material.
  • Presented as two different systems as follows:
    • Pulley System
    • X-Linked Sytem
Type Jaws Opening (mm) Casing Diameter (mm) Length (mm) Capacity (mm) Weight (mm)
ZKP600 600 720/640 3650 55 1560
ZKP640 640 750/670 3700 60 2000
ZKP690 690 800/720 3750 70 2050
ZKP770 770 880/800 3770 90 2400
ZKP850 850 980/900 3785 110 2500
ZKP890 890 1000/920 3790 125 2600
ZKP970 970 1180/1100 3800 150 3400
ZKP1050 1050 1180/1100 3850 200 3450
ZKP1070 1070 1180/1100 3900 250 3700
ZKP1140 1140 1250/1170 3985 300 3750
ZKP1170 1170 1300/1220 4000 310 3800
Document Name Date View
Bored Pile Grab Brochuer 09/03/2020 View